Ultra fast water system for Montrose port
Jim Raeper, technical manager for MPA, said: “The system will allow a minimum of 90 tonnes water supply to three ships simultaneously which we believe is unrivalled on the east coast of Scotland. The investment is part of a continued commitment by MPA to offer the marine sector a one stop, rapid turnaround quality service.”
The system is a combined installation and construction by FCH Construction Services Ltd and Ferrier Pumps Ltd. The new system provides a highly reactive, high volume ships water supply system that fully meets the requirements of both current and prospective shipping clients.
Advertisement
Hide AdAdvertisement
Hide AdNik Scott-Gray, Chief Executive for MPA said: “This investment is part of our ongoing strategy to serve as quickly and efficiently as possible the ever increasing number of visiting ships from the cargo and oil and gas industries that call into Montrose.
This story originally appeared in our sister paper the Montrose Review