Major oil rig recycling and offshore energy construction hub planned for port in north-east Scotland
The port at Ardersier, on the Moray Firth coast near Inverness, was one of the largest oil and gas fabrication yards in the world in the 1970s, employing up to 4,500 workers.
The yard shut in 2001 and since then the land has become a disused brownfield site.
Advertisement
Hide AdAdvertisement
Hide AdBut new owner Ardersier Port has set out plans for a major new development that will recycle defunct oil and gas rigs to make foundations for future fleets of floating offshore wind farms, bringing thousands of long-term jobs.
Proposals include a £300 million ‘green steel’ mill, which would be the UK’s first new steelworks in 50 years and powered by renewable energy.
A recent industry report has estimated there will be more than a million tonnes of North Sea topsides coming ashore for decommissioning over the next decade.
Ardersier Port owner Steve Regan said: “This is a once-in-a-generation opportunity to create a world-leading industrial and offshore wind manufacturing facility here in the UK.
“It is a simple plan where each element makes commercial sense as a stand-alone project, but when combined the benefits to the economy and the environment are multiplied.”
A £20 million dredging operation to clear out 2.5 million cubic metres of sand is set to begin shortly, to reopen the massive port once more.
The collected sand will be used to make concrete in the future.
A message from the Editor:
Thank you for reading this article. We’re more reliant on your support than ever as the shift in consumer habits brought about by coronavirus impacts our advertisers.
If you haven’t already, please consider supporting our trusted, fact-checked journalism by taking out a digital subscription.
Comments
Want to join the conversation? Please or to comment on this article.